BMA Belting & Steggles

ONLINE K031 pic2

BMA Belting was recently innvolved with the recent Evisceration line project at Baiada Steggles.

The Mareeba project included the fabrication of a five-metre cleated conveyor built by us with stainless steel chutes, an inspection platform and rerouting approximately 100 metres of four-inch vacuum line in the ceiling space of the plant.

Read about BMA Belting involvement in the recent Evisceration line project at Baiada Steggles here:

http://www.foodprocessing.com.au/articles/46917-Evisceration-line-revamps-at-Baiada-Steggles